It has been a busy few months for Sentanil’s CMS (Construction Management System). Sentanil Systems is Mipela’s sister company.
CMS, a QA based gas and water pipeline data management system, has been and is currently being used on the following projects:
Pipecraft DBNGP Loop 1 Extension and WHR Interconnect pipelines for AGIG
- These two pipelines (16 km and 1 km respectively), which were constructed in the Pilbara region of Western Australia, achieved practical completion in early November
- CMS was used to ensure pipeline quality compliance with AS 2885 and the associated MDR and third party validation requirements
- The CMS QA data was merged with the as-built survey pipe/weld data, and imported into X-Info Connect, where it will form the mapping and pipeline integrity baseline of AGIG’s on-going operation and maintenance of these 2 pipelines.
Nacap NGI pipeline construction for APA
- Nacap commenced construction of the 600km long pipeline from CS 7 on the DBNGP, just east of Geraldton, heading east to the goldfields area of Western Australia, early this year
- It is a complex project that involves CMS field data collection at four locations that are remote from the main CMS processing location
- The field data capture module of CMS is also being used by Nacap’s environment team to capture fauna sightings and capture during the pipeline ROW clearing and trenching construction process.
MPC Kinetic slurry and raw water pipeline construction for FMG
The construction of MPK’s concentrate and return pipelines for FMG’s Iron Bridge project in Pilbara, WA is nearing its completion after construction commenced in late 2021. CMS has used been used extensively by MPK to meet the strict quality requirements of the project.
Nacap Port Kembla Pipeline Project for Jemena
This 12km pipeline project has just commenced, and CMS is being used by Nacap for pipe/weld traceability and MDR requirements of the project.